Teraloop celebrates 18 months of customer operation

Correcting frequency and voltage for industrial consumers

Twenty-four seven for one year!

A producer of fresh dairy products located in the Azores, Portugal, suffers from numerous voltage sags, which interrupt production. The dairy factory has a peak power demand of 2.2MW, which is 15% of the consumption of the island.

The Teraloop flywheel system was installed to perform voltage control and to correct frequency deviations.

Previous
Previous

Meet Teraloop's new Sales Director

Next
Next

Teraloop access to new frontiers through strategic partnership with Arteche